Improvements

  • 2006- Replaced back door
  • 2007- Replaced asphalt driveway
  • 2011- Replaced furnace
  • 2011- Replaced carpet
  • 2012- Installed ceramic tile floor
  • 2013- Replaced roof
  • 2016- First floor bathroom renovation
  • 2017- Installation of privacy fence
  • 2018- Replaced front windows
  • 2018- Demolished and replaced wooden front stoop
  • 2019- Installation of laminate flooring
  • 2019- Replaced hot water heater